The Denver Broncos increased the size of the South scoreboard which required adding almost 100 feet to the existing support structure. LPR was contracted as the prime steel contractor carrying the steel detailing, fabrication, and erection. From the award in October 2022 until mobilization in February 2023, LPR was charged with working with the design team to complete design and connections while also establishing the complex erection plan. Project was completed on time in May 2023.