Both Liberty & Patriot were virtually identical 30 Cell ACC (Air Cooled Condenser) Units that were erected concurrently with a four month stagger. There was a combined total of 3,000 tons of structural steel, 2,000 tons of duct work and 9,000 linear feet of pipe. Each site included 38 foot fans with gear box and a 250 HP motor per cell (60 total), 432 HEC (Heat Exchange Core) bundles and 2 Condensate Tanks. LPR completed a total of 170,000 man hours for these sites.
Location:
Montgomery and Asylum Township, Pennsylvania
Client:
Evapco
General Contractor:
Gemma Power Systems