Installation of Two 12 Cell Siemens Design Bag-Houses for the primary ECS (Environmental Control System) plus four ID (Induced Draft) Fans tow for each Bag-House along with exhaust stacks, related duct work, silos for waste product storage and truck load out facilities for waste storage. In addition to the Primary ECS system LPR was also awarded the secondary ECS system which consisted of three (3) additional four cell bag houses and related stacks, fans and duct work.
Total bag house scope included 5 bag houses with completion of all ductwork after the building was erected and in place.

Location:

Calvert, Alabama

Client

Thyssen Krupp Stainless