INDUSTRIAL CONSTRUCTION
ThyssenKrupp
ThyssenKrupp
ThyssenKrupp
ThyssenKrupp

LPR completed the installation of two 12 Cell Siemens Design Baghouses for the primary ECS (Environmental Control System).  This work included four induced draft fans, two for each baghouse along with exhaust stacks, related duct work, silos for waste product storage and truck load out facilities for waste storage. In addition to the primary ECS system, LPR was also awarded the secondary ECS system which consisted of three additional four cell bag houses and related stacks, fans and duct work. The total baghouse scope included 5 baghouses with completion of all duct work after the building was erected and in place.

Location:

Calvert, Alabama

Client:

Thyssen Krupp Stainless

Start typing and press Enter to search

Greensville 80 Cell ACC